TSC 59 · B0059 VALLEY · SUBSYSTEM 2702 -27.452816, 153.040551 BCC METRO · SCATS 6.9.4

DEMO ONLY - ANN STREET / MURRI WAY

Austroads AGTM Part 3 & TMR QGTTM Work-Zone Simulator — Click individual lanes on the canvas, inspect satellite alignment, and generate TMP work windows.

Saved TSCs:
Active Time Slice
2026-10-27 08:00
Cycle: 100.0s · Linked
Intersection Flow
2,848 veh/hr
RF/MF Telemetry Active
Peak Approach DS%
159.0% DS
Base: 159.0% · Limit: 90%
95th %ile Queue (Q95)
142 m (22 veh)
Sign Dist (Q95+SSD): 217 m
Worst Control Delay & LOS
LOS F · 94.2 s/veh
Austroads AGTM Pt 3
Downstream Exit V/C
56.9% V/C
0 Active Closures
TMP Engineering Verdict
BASELINE OPERATING
Safe Window: 19:00–05:00

True-Azimuth Lane-Level Canvas & Satellite GIS View

Click any Individual Detector Lane (L1..L4), Slip Lane, or Exit Throat directly on the diagram to toggle cones.

Open Inbound Lane Queue Bar (Q95 m) Slip Bypass Exit Throat Closed Work-Zone
Click any lane strip to close/open
Hour Scrubber: 2026-10-27 08:00 (AM Peak)
Slip Flow %: +35%
Exit Cap/Ln: 900
Green Boost: 0%
VMS Detour: 0%
Speed (km/h): 60
WZ Factor fwz: 0.85

Universal Lane & Corner Closure Switchboard

Synchronized with canvas lanes — toggle individual detector lanes, slip lanes, or exit throats.

Austroads Approach Saturation, Queue (Q95) & LOS

Upstream Check: OK

Automated 24-Hour TMP Permitted Work Window Schedule

Evaluates the active lane closure configuration across every recorded hour against Austroads practical saturation limits (🟢 Approved ≤85% DS · 🟡 Conditional 85–100% DS · 🔴 Peak Embargo >100% DS/VC).

Multi-Hour Baseline vs. Work-Zone Simulated Profile

Faded slate bars = Unclosed Baseline; Colored bars = Simulated Work-Zone. Click any bar to scrub time; hover for exact delta.